Double J's Bar Addition
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construct 2-stories above existing 1-story building for bar area (441 sf) with open patio (277 sf) on 2nd floor and storage/office space (441 sf) on 3rd floor
- Status
- Prospective
- Sector
- Commercial, Raw Materials, Residential, Consumer Products, Manufacturing (Industrial)
- Location
- Shelton, Connecticut, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Double J's Bar Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Construct 2-stories above existing 1-story building for bar area (441 sf) with open patio (277 sf) on 2nd floor and storage/office space (441 sf) on 3rd floor |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Shelton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Raw Materials, Residential, Consumer Products, Manufacturing (Industrial) |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
