logo

Double-laning of NEWH from Dochula-Chuserbu (Package 3)

Sector: Road • Location: Bhutan

Source: Reconnecting Asia

Project

Double-laning of NEWH from Dochula-Chuserbu (Package 3)

Sector
Road, Manufacturing (Industrial)
Location
Bhutan
Updated
22 Jul 2026
Source
Reconnecting Asia

ConstructChat

Ask ConstructChat about Double-laning of NEWH from Dochula-Chuserbu (Package 3)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

2 Q
The project “Double-laning of NEWH from Dochula-Chuserbu (Package 3)” is an infrastructure initiative in the Road sector, located in Bhutan. Taiyo aggregates data on it from Reconnecting Asia.

Participants

Not available for this record.

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Double-laning of NEWH from Dochula-Chuserbu (Package 3)

Original sector

Road

Location

Country

Bhutan

Source

Source reliability

Medium

Source

Reconnecting Asia

More Details

Record type

Project

Sector

Road, Manufacturing (Industrial)

Article published date

2023-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project