Double Tree Hotel Building
Sector: Manufacturing (Industrial) • Location: Grand Junction, Colorado, United States of America
Source: Dodge
In The Double Tree Hotel, We Will Be Refinishing 4 Hotel Rooms And Partial Corridor On The 7Th Floor Only. Utility Account 8627-00 |Non-Residential Planning Clearance - Interior Remodel |Total Square Feet: 2000
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Hotel, Power Transmission, Power Generation (CCGT), Commercial, Residential
- Location
- Grand Junction, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Double Tree Hotel Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In The Double Tree Hotel, We Will Be Refinishing 4 Hotel Rooms And Partial Corridor On The 7Th Floor Only. Utility Account 8627-00 |Non-Residential Planning Clearance - Interior Remodel |Total Square Feet: 2000 |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Grand Junction |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Hotel, Power Transmission, Power Generation (CCGT), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
