Doubling of Katni - Singrauli Railway Line [261 km]
Sector: Bridge • Location: Katni, Madhya Pradesh, India
Source: India Investment Grid (IIG)
Information IRCON MP has come up with Doubling of Katni - Singrauli Railway Line [261 km] with a ticket size of 3417.9 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The doubling of 261 km long Katni Singarauli line is an important project in the state of Madhy
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information IRCON MP has come up with Doubling of Katni - Singrauli Railway Line [261 km] with a ticket size of 3417.9 INR Crores. This project in Railway Track sub-sector involves The current status of the project is - and is being developed through the EPC route. Economic/Social Impact of the Project The doubling of 261 km long Katni Singarauli line is an important project in the state of Madhya Pradesh covering the districts of Katni, Shahdol, Sidhi and Singrauli and the Sanjay Dubri National Tiger Reserve [27 Km]. The section intersects Allahabad Mumbai double line route at Katni and connects with Bina Bilaspur double line electrified route via Saugor, Anuppur [located about 90 km north of Jabalpur] Katni Singrauli is a critical section with growing inward and outward traffic between the Northern Coal Fields [Singrauli Mines] and thermal power plants around the region. The addition of this double line would provide the necessary line capacity for introduction of additional mail express and passenger trains to serve the people of the area and transportation of coal from collieries. The project was sanctioned in the year 2015 2016 at the cost of INR 1762.93 crore. It shall have 284 minor bridges, 36 major bridges, 51 RUB/LHS, 3 ROB etc. Total length commissioned is 180.46 1 km. Details of Commissioned sections are as under Section commissioned up to Nov 2023 [i] Majhaoli Gondawali [15.05 Km] Opened on 16.04.2019 [ii] KatangiKhurd Salhana [18.07 Km] Opened on 24.09.2019 [iii] Gondwali Mahdeiya [7.35 Km] Opened on 07.03.2020 [iv] New KatniJn. KatangiKhurd [7.79 Km] Opened on 14.06.2021 [v] Deoragram Majhaloi [7.60 Km] Opened on 07.09.2021 [vi] Mahediya Singrauli [5.88Km] Opened on 11.02.2022 [vii] Salhana KhannaBanjari [21.33 Km] Opened on 13.02.2022 [viii] Marwasgram Niwas Road [16.94 km] Opened on 13.08.2022 [ix] Saraigram Gajarabahra [10.35 Km] Opened on 17.11.2022 [x] Gajrabahra to Deoragram [10.44 KM] Opened on 17.11.2022 [xi] Khannabanjari Mahroi [11.9Km] Opened on 23.01.2023 [xii] Niwas Road Saraigram* [28.66 Km] Opened on 27 03 2023 [xiii] Mahroi Vijaysota [19.10 Km] Opened on 27.06.2023 Total 180.46 Km |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
