Douglas Pike Bridge Lane Shift and Replacement Project
Sector: Road • Location: Smithfield, Rhode Island, United States
Source: WJAR
The Rhode Island Department of Transportation will be shifting all travel lanes on the Douglas Pike Bridge in Smithfield starting April 12, 2026. The lane shifts will occur where the bridge passes over Interstate 295 North. From April 15 to April 17, lane and road closures with detours will be in place from 9 p.m. to 5 a.m. More information on the bridge replacement project is available.
- Status
- Under Construction
- Sector
- Road, Bridge
- Location
- Smithfield, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- WJAR
ConstructChat
Ask ConstructChat about Douglas Pike Bridge Lane Shift and Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rhode Island Department of Transportation will be shifting all travel lanes on the Douglas Pike Bridge in Smithfield starting April 12, 2026. The lane shifts will occur where the bridge passes over Interstate 295 North. From April 15 to April 17, lane and road closures with detours will be in place from 9 p.m. to 5 a.m. More information on the bridge replacement project is available. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Smithfield |
Source
Source | WJAR |
URL |
More Details
Record type | Project |
Sector | Road, Bridge |
Article published date | 2026-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
