logo

Douglas Water Purification plant rehabilitation project in South Africa

Sector: Residential • Location: Northern Cape, South Africa

Source: InfraPPPWorld

Project
Closed

The project involves rehabilitation work at the Douglas Water Purification Plant in Northern Cape, South Africa.The project entails upgrading the existing water purification plant and general repair work to existing buildings. The scope of work includes:Replacing existing raw water pumps at the Oranje-Vaalrivier Canal and Vaal river canal;Building and installing a new electrical control panel for

Project Information FAQ

Project Information

4 Q
The project “Douglas Water Purification plant rehabilitation project in South Africa” is an infrastructure initiative in the Residential sector, located in Northern Cape, South Africa. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves rehabilitation work at the Douglas Water Purification Plant in Northern Cape, South Africa.The project entails upgrading the existing water purification plant and general repair work to existing buildings. The scope of work includes:Replacing existing raw water pumps at the Oranje-Vaalrivier Canal and Vaal river canal;Building and installing a new electrical control panel for Vaalriver canal pumps;Construction of 140m of 300 mm diameter uPVC supply pipe, 1750m, 300mm class 9 uPVC supply pipe and 40m, 300mm uPVC waste water pipe;Construction of 11,51m diameter X 3,45m high round reservoir with roof and concrete slabs for reservoir foundations and filters;Supply and install purified water pump with control panel at existing purification plant;Supply and install flocculent and liquid chlorine dosing pumps at the existing purification plant; andSupply, construct and commission UFMC-3 X 1800mm filters with electrical control panels and raw water supply pumps.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data