Douglaston - Little Neck Library Construction
Sector: Education • Location: Flushing, New York, United States of America
Source: Dodge
This Project consists of the demolition of an existing 1 story library building with partial cellar and the construction of a new library building with 2 levels above grade and 1 level below grade. The building houses 3 readings rooms, 2 meeting rooms and staff support spaces and aims to be energy efficient and sustainable in all design and engineering elements.
- Status
- Closed
- Sector
- Education, Government, Commercial, Manufacturing (Industrial)
- Location
- Flushing, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Douglaston - Little Neck Library Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project consists of the demolition of an existing 1 story library building with partial cellar and the construction of a new library building with 2 levels above grade and 1 level below grade. The building houses 3 readings rooms, 2 meeting rooms and staff support spaces and aims to be energy efficient and sustainable in all design and engineering elements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Flushing |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Education, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
