DOUKKALA IRRIG
One of 4,331 projects Taiyo tracks in Morocco.
Source: World Bank Group
The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for p
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Consumer Products, Raw Materials, Government
- Location
- Morocco
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DOUKKALA IRRIG
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for pumping stations; land preparation and consolidation; installation of 416 km of a buried pipe distribution system and associated mobile sprinkler equipment; excavation for main drainage channels; 108 km of classified road rehabilitation and 85 km construction of new classified roads; construction of farm access roads and windbreaks; construction of buildings and provision of equipment; construction of six new milk collecting centers; (b) a bilharzia control programme for the Province of El Jadida; (c) a feasibility study for irrigation, water supply and power development based on a dam at Dechrael-Oued; and (d) a feasibility study for the production, processing, and marketing of fruits and vegetables in the Massa region in southern Morocco. This report comprises two impact evaluation reports for Mexico an Morocco, and an overview which synthesizes the findings of both impact evaluations regarding the extent of, and reasons for, sustainability a compares the impact of irrigation systems design on project performance striking feature of all four projects is the lower agricultural and performance than that estimated at the time of audit. Weaker commodity an inadequate development approach in one project, lower than expected efficiencies, insufficient attention to operation and maintenance in a projects, and damage to the environment and natural resources have been main factors affecting performance. However, with one exception, which performed poorly, the degree of success in the transfer of technology respect of both irrigation practice and agricultural productivity has continued to be sustained in the other three projects. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Morocco |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Consumer Products, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project