DOUKKALA IRRIG
Sector: Road • Location: Morocco
Source: World Bank Group
The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for pumping stations; land preparation and consolidation; installation of 416 km of a buried pipe distribution system and associated mobile sprinkler equipment; excavation for main drainage channels; 108 km of classified road rehabilitation and 85 km construction of new classified roads; construction of farm access roads and windbreaks; construction of buildings and provision of equipment; construction of six new milk collecting centers; (b) a bilharzia control programme for the Province of El Jadida; (c) a feasibility study for irrigation, water supply and power development based on a dam at Dechrael-Oued; and (d) a feasibility study for the production, processing, and marketing of fruits and vegetables in the Massa region in southern Morocco. This report comprises two impact evaluation reports for Mexico an Morocco, and an overview which synthesizes the findings of both impact evaluations regarding the extent of, and reasons for, sustainability a compares the impact of irrigation systems design on project performance striking feature of all four projects is the lower agricultural and performance than that estimated at the time of audit. Weaker commodity an inadequate development approach in one project, lower than expected efficiencies, insufficient attention to operation and maintenance in a projects, and damage to the environment and natural resources have been main factors affecting performance. However, with one exception, which performed poorly, the degree of success in the transfer of technology respect of both irrigation practice and agricultural productivity has continued to be sustained in the other three projects. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in Morocco
- PROGRAMME DE MODERNISATION ROUTIERE
- Redal S.A. and Amendis S.A.
- Morocco - Project to Update the Drinking Water Supply in the Rabat-Casablanca Coastal Area
- ROUTES RURALES IV
- ADM MODERNISATION INFORMATIQUE - COVID19
- ROUTES RURALES III
- Morocco - Project to Increase Capacity on the Tanger-Marrakech Railway Line
- Lyonnaise des Eaux de Casablanca
