logo
ProjectClosed

DOUKKALA IRRIG

One of 4,331 projects Taiyo tracks in Morocco.

Source: World Bank Group

The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for p

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Consumer Products, Raw Materials, Government
Location
Morocco
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about DOUKKALA IRRIG

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “DOUKKALA IRRIG” is an infrastructure initiative in the Road sector, located in Morocco. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Doukkala Irrigation Project for Morocco consists of: (a) in the Doukkala: enlargement of the main supply canal (29 km), construction of about 6 km of feeder canal and installation of automatic flow regulators; construction of 4 electric pumping stations, each with an elevated equalizing reservoir; construction of 50 km of 60 kv and 50 km of 22 kv power transmission lines and a substation for pumping stations; land preparation and consolidation; installation of 416 km of a buried pipe distribution system and associated mobile sprinkler equipment; excavation for main drainage channels; 108 km of classified road rehabilitation and 85 km construction of new classified roads; construction of farm access roads and windbreaks; construction of buildings and provision of equipment; construction of six new milk collecting centers; (b) a bilharzia control programme for the Province of El Jadida; (c) a feasibility study for irrigation, water supply and power development based on a dam at Dechrael-Oued; and (d) a feasibility study for the production, processing, and marketing of fruits and vegetables in the Massa region in southern Morocco. This report comprises two impact evaluation reports for Mexico an Morocco, and an overview which synthesizes the findings of both impact evaluations regarding the extent of, and reasons for, sustainability a compares the impact of irrigation systems design on project performance striking feature of all four projects is the lower agricultural and performance than that estimated at the time of audit. Weaker commodity an inadequate development approach in one project, lower than expected efficiencies, insufficient attention to operation and maintenance in a projects, and damage to the environment and natural resources have been main factors affecting performance. However, with one exception, which performed poorly, the degree of success in the transfer of technology respect of both irrigation practice and agricultural productivity has continued to be sustained in the other three projects.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Morocco

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Consumer Products, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project