logo

Douro Fire Station Reconfiguration

Sector: Oil and Gas • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The fire station will be reconfigured to a fire post-disaster building and the storage area repurposed for use by Public Works. Key components of the project include: · Filling in floor grates, removing the oil furnace, installing three heating systems and removing the vestibule attachment; · Re-purposing the ancillary space, which includes removing an office and the lunchroom, and installing a pr

Project Information FAQ

Project Information

4 Q
The project “Douro Fire Station Reconfiguration” is an infrastructure initiative in the Oil and Gas sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The fire station will be reconfigured to a fire post-disaster building and the storage area repurposed for use by Public Works. Key components of the project include: · Filling in floor grates, removing the oil furnace, installing three heating systems and removing the vestibule attachment; · Re-purposing the ancillary space, which includes removing an office and the lunchroom, and installing a proper washroom with ventilation and a shower stall; · Upgrading the HVAC system for better air quality throughout the building; · Installing an exhaust fan to meet Ontario Building Code requirements; · Upgrading windows to allow for more natural light and to improve energy efficiency; · Upgrading the septic system; · Increasing indoor storage for fire vehicles to allow for a longer vehicle lifecycle; · Increasing health and safety protection for staff by separating the fire department from the Public Works storage area; and Ensuring bunker gear is more easily accessible to allow firefighters to respond to calls more quickly.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data