Douro Fire Station Reconfiguration
Sector: Oil and Gas • Location: Ontario, Canada
Source: Infrastructure Canada
The fire station will be reconfigured to a fire post-disaster building and the storage area repurposed for use by Public Works. Key components of the project include: · Filling in floor grates, removing the oil furnace, installing three heating systems and removing the vestibule attachment; · Re-purposing the ancillary space, which includes removing an office and the lunchroom, and installing a pr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The fire station will be reconfigured to a fire post-disaster building and the storage area repurposed for use by Public Works. Key components of the project include: · Filling in floor grates, removing the oil furnace, installing three heating systems and removing the vestibule attachment; · Re-purposing the ancillary space, which includes removing an office and the lunchroom, and installing a proper washroom with ventilation and a shower stall; · Upgrading the HVAC system for better air quality throughout the building; · Installing an exhaust fan to meet Ontario Building Code requirements; · Upgrading windows to allow for more natural light and to improve energy efficiency; · Upgrading the septic system; · Increasing indoor storage for fire vehicles to allow for a longer vehicle lifecycle; · Increasing health and safety protection for staff by separating the fire department from the Public Works storage area; and Ensuring bunker gear is more easily accessible to allow firefighters to respond to calls more quickly. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
