TANESCO, a state-owned enterprise that supplies electricity to Tanzania, contracted Ltd. Dowans Holdings to install a rental (leased) plant at Ubungo where at site B (near the SONGAS plant) units of 22 MW are installed and at site A (behind TANESCO Head Office Ubungo building) units of 80 MW are to be installed in 2006. The project was estimated to cost around T.Shs. 172.5 billion. Intially, TANES

Status
Closed
Sector
Commercial, Natural Gas, Power Generation (CCGT), Government, Residential
Location
Tanzania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Dowans Rental Power Ubungo

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Dowans Rental Power Ubungo” is an infrastructure initiative in the Commercial sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

concluded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

TANESCO, a state-owned enterprise that supplies electricity to Tanzania, contracted Ltd. Dowans Holdings to install a rental (leased) plant at Ubungo where at site B (near the SONGAS plant) units of 22 MW are installed and at site A (behind TANESCO Head Office Ubungo building) units of 80 MW are to be installed in 2006. The project was estimated to cost around T.Shs. 172.5 billion. Intially, TANESCO chose Richmond Development Corporation (RDC) of United States of America as the contractor. The contract was signed on 23rd June 2006 and the works were supposed to have been completed in 150 days, and the rental contract is for two years. However, RDC on 23rd December 2006 assigned their rights and obligations acceptable within the contract to Dowans Holdings Ltd. of United Arab Emirates. Delivery of the first 20MWplant was done and by the end of the year the plant was still undergoing test runs. The contractor managed to connect to the grid on several occasions but the plant has not stabilized due to technical problems. The balance of the plant i.e. 80 MW was sea frighted and equipment was received in Dar es Salaam on 27th December, 2006. Installation was expected to start when site leveling and compaction works were completed. The rental project concluded in August 2008. It was reported that Tanesco was considering buying the generators. In 2011, Symbion Power bought up the 120MW power plant (lying idle) for an estimated $120 million. See project Symbion Rental Ubungo Power Plant.

Original sector

Energy

Budget

Location

Country

Tanzania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Natural Gas, Power Generation (CCGT), Government, Residential

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project