TANESCO, a state-owned enterprise that supplies electricity to Tanzania, contracted Ltd. Dowans Holdings to install a rental (leased) plant at Ubungo where at site B (near the SONGAS plant) units of 22 MW are installed and at site A (behind TANESCO Head Office Ubungo building) units of 80 MW are to be installed in 2006. The project was estimated to cost around T.Shs. 172.5 billion. Intially, TANES

Project Information FAQ

Project Information

5 Q
The project “Dowans Rental Power Ubungo” is an infrastructure initiative in the Commercial sector, located in Dar es Salaam, Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

concluded

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

TANESCO, a state-owned enterprise that supplies electricity to Tanzania, contracted Ltd. Dowans Holdings to install a rental (leased) plant at Ubungo where at site B (near the SONGAS plant) units of 22 MW are installed and at site A (behind TANESCO Head Office Ubungo building) units of 80 MW are to be installed in 2006. The project was estimated to cost around T.Shs. 172.5 billion. Intially, TANESCO chose Richmond Development Corporation (RDC) of United States of America as the contractor. The contract was signed on 23rd June 2006 and the works were supposed to have been completed in 150 days, and the rental contract is for two years. However, RDC on 23rd December 2006 assigned their rights and obligations acceptable within the contract to Dowans Holdings Ltd. of United Arab Emirates. Delivery of the first 20MWplant was done and by the end of the year the plant was still undergoing test runs. The contractor managed to connect to the grid on several occasions but the plant has not stabilized due to technical problems. The balance of the plant i.e. 80 MW was sea frighted and equipment was received in Dar es Salaam on 27th December, 2006. Installation was expected to start when site leveling and compaction works were completed. The rental project concluded in August 2008. It was reported that Tanesco was considering buying the generators. In 2011, Symbion Power bought up the 120MW power plant (lying idle) for an estimated $120 million. See project Symbion Rental Ubungo Power Plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data