Downstream Guide Cell for Lock & Dam 25 NESP
Sector: Hydro • Location: Winfield, Missouri, United States of America
Source: Dodge
The proposed project will consist of the construction of a DS Guide Cell to support the new 1,200-foot-long lock planned at L&D 25 in Winfield, MO. The DS Guide Cell will be approximately 50 ft in diameter and will be constructed using cellular sheet pile and founded on 4 ft diameter drilled shafts socketed into bedrock. Steel plates and horizontal corner protection will be provided at the barge i
- Status
- Closed
- Sector
- Hydro, Steel, Commercial, Manufacturing (Industrial), Water Supply and Storage, Metal
- Location
- Winfield, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Downstream Guide Cell for Lock & Dam 25 NESP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will consist of the construction of a DS Guide Cell to support the new 1,200-foot-long lock planned at L&D 25 in Winfield, MO. The DS Guide Cell will be approximately 50 ft in diameter and will be constructed using cellular sheet pile and founded on 4 ft diameter drilled shafts socketed into bedrock. Steel plates and horizontal corner protection will be provided at the barge impact zone regions of the guide cell. The traffic faces of the cell will have standard steel wall... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Winfield |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Steel, Commercial, Manufacturing (Industrial), Water Supply and Storage, Metal |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in United States of America
- Clearlake Affordable Housing Project
- NEW SAVANNAH BLUFF LOCK & DAM REPAIR & RESTORATION - TIA
- INSTALL RCUT AT SR 515 & SR 325 (NOTELY DAM RD)
- Wichita & Affiliated Tribes Broadband Infrastructure Deployment Project and Broadband Use and Adoption Project
- Renovation of the potable water piping and distribution system from the Añarbe Dam to the Petritegi DWTP in Huesca (Spain)
- Antelope Creek Juvenile Fish Passage Improvement
- Removal of Centreville Dam, Centreville, MD: Hurricane Sandy Disaster Relief, DOI Proj MD089
- Environmental System Science (ESS)
