Downtown Campus Burnside Hall Phase 2
Sector: Commercial • Location: Montreal, Quebec, Canada
Source: Dodge USA
18-104 - Downtown Campus (Burnside Hall), Phase 2: Electrical modifications in the data center. Perform electrical modifications in the data center necessary to hook up a 300 kW / kVA UPS that has already been purchased and installed by McGill. The goal of this project is to remove the existing UPS # 3 & # 4, replace them with a new 300 kW / kVA UPS, and redistribute the electrical loads to the ex
- Status
- Prospective
- Sector
- Commercial, Data Center, Water Supply and Storage, Education, Power Generation (CCGT), Power Transmission, Waste Processing and Treatment, Manufacturing (Industrial)
- Location
- Montreal, Quebec, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Campus Burnside Hall Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 18-104 - Downtown Campus (Burnside Hall), Phase 2: Electrical modifications in the data center. Perform electrical modifications in the data center necessary to hook up a 300 kW / kVA UPS that has already been purchased and installed by McGill. The goal of this project is to remove the existing UPS # 3 & # 4, replace them with a new 300 kW / kVA UPS, and redistribute the electrical loads to the existing "buses" located above the server rows. In addition, the project provides for several impro... |
Procurement method |
Location
Country | Canada |
State | Quebec |
City | Montreal |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Water Supply and Storage, Education, Power Generation (CCGT), Power Transmission, Waste Processing and Treatment, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
