logo
ProjectClosed

Downtown Intersection Improvement

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

The main items of Work of this Contract include the following: .1 Traffic Accommodation and Utility Coordination, .2 Demolition, removal and disposal of waste materials including concrete, asphalt, and paving stones, .3 Trench excavation and surface grading, .4 Catch basin supply and installation including connection to stormwater infrastructure, .5 Supply and Installation of fire hydrant assembly

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Power Generation (CCGT)
Location
Taber, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Downtown Intersection Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Downtown Intersection Improvement” is an infrastructure initiative in the Commercial sector, located in Taber, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main items of Work of this Contract include the following: .1 Traffic Accommodation and Utility Coordination, .2 Demolition, removal and disposal of waste materials including concrete, asphalt, and paving stones, .3 Trench excavation and surface grading, .4 Catch basin supply and installation including connection to stormwater infrastructure, .5 Supply and Installation of fire hydrant assembly .6 Supply and installation of granular base, asphalt, concrete, and landscaping, .7 Site Restora...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Taber

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Government, Rail, Power Generation (CCGT)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project