Downtown Lighting Power Source Phase 2 IQC
Sector: Commercial • Location: Davenport, Iowa, United States of America
Source: Dodge USA
This is the second phase of modifications to the power provisions/controls for selected downtown streetlighting locations. Currently there are locations throughout downtown where individual/groups of light fixtures are controlled by adjoining buildings and are not served by the City s electrical infrastructure. This project will switch the power source to the street lighting shown to be on the Cit
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Road, Government
- Location
- Davenport, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Lighting Power Source Phase 2 IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is the second phase of modifications to the power provisions/controls for selected downtown streetlighting locations. Currently there are locations throughout downtown where individual/groups of light fixtures are controlled by adjoining buildings and are not served by the City s electrical infrastructure. This project will switch the power source to the street lighting shown to be on the City s electrical infrastructure. Besides electrical components, the work also includes excavation, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Davenport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Road, Government |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
