Downtown Paver Completion
Sector: Road • Location: Brush, Colorado, United States of America
Source: Dodge USA
Removal of existing dirt and gravel Proper placement and compaction of base material and bedding in new paver area Installation of pavers that match the existing downtown pavers (Exhibit A) Details: Ground leveling will be done in the inlays to allow Brick Pavers to be level with existing sidewalk and curb as needed. Pavers will be placed in an estimated area of 7.5 x 123 uncompleted section on th
- Status
- Prospective
- Sector
- Road, Government, Commercial, Manufacturing (Industrial), Car parking, Automotive
- Location
- Brush, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Paver Completion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of existing dirt and gravel Proper placement and compaction of base material and bedding in new paver area Installation of pavers that match the existing downtown pavers (Exhibit A) Details: Ground leveling will be done in the inlays to allow Brick Pavers to be level with existing sidewalk and curb as needed. Pavers will be placed in an estimated area of 7.5 x 123 uncompleted section on the north end of the 200 block (along Edmunds Street) of the west side of Clayton to the alleyway. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Brush |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial), Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
