Downtown Paver Sidewalks Replacement Group 2
Sector: Cement • Location: Mound, Minnesota, United States of America
Source: Dodge USA
10,100 SF Paver Removals 2,800 SF Concrete Walk and Driveway Removals 800 LF Concrete Curb and Gutter Replacement 5,7250 SF Colored Concrete Walk 3,400 SF Colored and Stamped Concrete Walk 3,600 SF Standard 4 , 6 , and 8 Concrete Walk and Driveway Replacement
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Mound, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Paver Sidewalks Replacement Group 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 10,100 SF Paver Removals 2,800 SF Concrete Walk and Driveway Removals 800 LF Concrete Curb and Gutter Replacement 5,7250 SF Colored Concrete Walk 3,400 SF Colored and Stamped Concrete Walk 3,600 SF Standard 4 , 6 , and 8 Concrete Walk and Driveway Replacement |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Mound |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
