logo
ProjectProject Awarded

Downtown Rail Extension (DTX) project

The status, timeline and source of this project. A free account opens every field.

Source: InfraPPPWorld

The project involves the development of a Downtown Rail Extension (DTX) that will extend Caltrain commuter rail from its current terminus at Fourth and King Streets to the new Salesforce Transit Center and accommodate future California High-Speed Rail service.The 1.3-mile rail extension (1.95 miles of total construction length) will be constructed principally below grade using cut-and-cover and mi

Status
Closed
Sector
Road, Rail, Power Transmission, Mass Transit, Tunnel, Power Generation (CCGT), Government
Location
California, United States of America
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Downtown Rail Extension (DTX) project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Downtown Rail Extension (DTX) project” is an infrastructure initiative in the Road sector, located in California, (USA) United States of America. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Company

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development of a Downtown Rail Extension (DTX) that will extend Caltrain commuter rail from its current terminus at Fourth and King Streets to the new Salesforce Transit Center and accommodate future California High-Speed Rail service.The 1.3-mile rail extension (1.95 miles of total construction length) will be constructed principally below grade using cut-and-cover and mined tunneling methods underneath Townsend and Second Streets. The project includes an underground station at Fourth and Townsend Streets, six structures for emergency exits, and ventilation along the alignment, utility relocation, and rail systems work.Fourth and Townsend Street StationThe new underground station at Fourth and Townsend Streets will serve Caltrain commuters. The station entrances along the north and south sides of Townsend Street will lead to two levels below grade: a concourse mezzanine and a train platform. The concourse will accommodate passenger amenities such as ticketing; maps and schedule information; and restrooms. It will also house mechanical and electrical rooms and Caltrain staff areas. The Train Platform will feature a center platform with one passing track on the south side.Transit Center Train StationThe two below-grade levels of the Transit Center, the Lower Concourse, and the Train Platform level will be built out and opened in Phase 2. The Lower Concourse will house rail ticketing, passenger waiting areas, and support spaces. At its east end, it will connect to the intercity bus terminal and a pedestrian tunnel leading to the Embarcadero BART/Muni station, approximately one block north of the Transit Center. Along with ticketing and passenger waiting areas for rail and support spaces, the Lower Concourse will contain retail space. The Train Platform will contain six tracks and three Caltrain commuter and high-speed rail service platforms. Back-of-house support spaces will also be built on the Train Platform level to support rail service.

Original sector

Transport

Location

Country

United States of America (USA)

State

California

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Road, Rail, Power Transmission, Mass Transit, Tunnel, Power Generation (CCGT), Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project