Downtown Reconstruction Phase 1
One of 10,000+ projects Taiyo tracks in Iowa.
Source: Dodge USA
Description: The project is located in the City of Ely, IA, along the entirety of Traer Street and Main Street from Traer Street to Dows Street. The work for which bids are asked generally includes the following: Project will replace and abandon existing 4-inch water main with approximately 215 LF of 6-inch and 1,320 LF of 10-inch C900 PVC water main and 158LF of 10-inch ductile iron water main. P
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Ely, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Reconstruction Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Description: The project is located in the City of Ely, IA, along the entirety of Traer Street and Main Street from Traer Street to Dows Street. The work for which bids are asked generally includes the following: Project will replace and abandon existing 4-inch water main with approximately 215 LF of 6-inch and 1,320 LF of 10-inch C900 PVC water main and 158LF of 10-inch ductile iron water main. Project will replace and remove existing sanitary sewer with 508 LF of 8-inch PVC sanitary sewer a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Ely |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2024-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
