logo
ProjectBidding

Downtown Revitalization Phase 1

Bidding · Idaho · Last reported Dec 2024

Source: Dodge USA

The Project consists of traffic control; demolition of existing sidewalks, curb & gutter, roadway, and associated facilities; construction of a 2' paver strip for utilities, reconstruction of approximately 620 square yards of sidewalk; 98square yards of concrete crosswalk; 1500 square yards of asphalt roadway with 750 linear feet curb & gutter; reconnection of lighting, irrigation, and stormwater

Status
Prospective
Sector
Water Supply and Storage, Government, Cement, Commercial, Car parking, Road, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Automotive
Location
Blackfoot, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Downtown Revitalization Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Downtown Revitalization Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Blackfoot, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of traffic control; demolition of existing sidewalks, curb & gutter, roadway, and associated facilities; construction of a 2' paver strip for utilities, reconstruction of approximately 620 square yards of sidewalk; 98square yards of concrete crosswalk; 1500 square yards of asphalt roadway with 750 linear feet curb & gutter; reconnection of lighting, irrigation, and stormwater facilities; and permanent installation of benches and garbage receptacles.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Blackfoot

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Cement, Commercial, Car parking, Road, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Automotive

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project