Downtown Streetscape Improvements Phases 3 & 4 REBID
Sector: Commercial • Location: Newton, North Carolina, United States of America
Source: Dodge USA
Phases 3 and 4 consist of replacement of existing road, sidewalks, and utilities on College Avenue between the intersection of A Street and 2nd Street in Downtown and on East 1st Street between North Main Avenue and North College Avenue and stormwater improvements on East A Street between College Avenue and South Brady Avenue. General project work to include removal of existing surfaces, site item
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Power Generation (CCGT)
- Location
- Newton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Downtown Streetscape Improvements Phases 3 & 4 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phases 3 and 4 consist of replacement of existing road, sidewalks, and utilities on College Avenue between the intersection of A Street and 2nd Street in Downtown and on East 1st Street between North Main Avenue and North College Avenue and stormwater improvements on East A Street between College Avenue and South Brady Avenue. General project work to include removal of existing surfaces, site items, and utilities, installation of decorative pavers, traffic striping, asphalt paving, concrete p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Newton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Car parking, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
