Downtown Terminal Customer Service Center Construction
Bid results · Colorado · Last reported Oct 2025
Source: Dodge
East Wall Construction 1. Contractors will frame standard walls from the existing room corner to existing storefront window mullion, floor to deck and include the following features: a. Furnish and install qty one - 36 standard entry door from the lobby to the customer service center, door will be of steel material and include an electronic locking handle device for security. The door will include
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Steel, Government, Metal
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Downtown Terminal Customer Service Center Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | East Wall Construction 1. Contractors will frame standard walls from the existing room corner to existing storefront window mullion, floor to deck and include the following features: a. Furnish and install qty one - 36 standard entry door from the lobby to the customer service center, door will be of steel material and include an electronic locking handle device for security. The door will include one single small vision panel on the handle side and door closer and will be painted bright whit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Steel, Government, Metal |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
