DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
Sector: Water Supply and Storage • Location: Vidalia, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project is located completely within the City of Vidalia, Georgia. The project will construct pedestrian improvements of approximately 1,200 linear feet on the west side of Aimwell Road from Sally D. Meadows Elementary School to Waters Drive; approximately 2,300 linear feet on the north side of 5th Street from Green Street to Aimwell Road; approximately 1,900 linear feet on the south side of 3
- Status
- Under Construction
- Sector
- Water Supply and Storage, Cement, Road, Car parking, Government, Automotive
- Location
- Vidalia, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located completely within the City of Vidalia, Georgia. The project will construct pedestrian improvements of approximately 1,200 linear feet on the west side of Aimwell Road from Sally D. Meadows Elementary School to Waters Drive; approximately 2,300 linear feet on the north side of 5th Street from Green Street to Aimwell Road; approximately 1,900 linear feet on the south side of 3rd Street from Green Street to Smith Street; approximately 900 linear feet along the east side of Bay Street from 5th Street to 3rd Street; and approximately 900 linear feet along the east side of Smith Street from 5th Street to 3rd Street. The total length of the project is approximately 1.4 miles. Improvements include a 5 foot concrete sidewalk, concrete curb and gutter, driveways, ADA ramps, parking islands, and striping. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Vidalia |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Car parking, Government, Automotive |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
