Dow's Fort Saskatchewan Path2Zero Cogeneration Project
Sector: Energy • Location: Fort Saskatchewan, Alberta, Canada
Source: The Globe and Mail
Worley has been selected by Dow to provide front end engineering design under a new EPCM services contract for the cogeneration component of Dow’s Fort Saskatchewan Path2Zero project in Alberta, Canada. The project involves a brownfield cogeneration facility with integrated post-combustion carbon capture, aiming to create the world’s first net zero emissions integrated ethylene cracker and derivat
- Status
- Prospective
- Sector
- Energy
- Location
- Fort Saskatchewan, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- The Globe and Mail
ConstructChat
Ask ConstructChat about Dow's Fort Saskatchewan Path2Zero Cogeneration Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Worley has been selected by Dow to provide front end engineering design under a new EPCM services contract for the cogeneration component of Dow’s Fort Saskatchewan Path2Zero project in Alberta, Canada. The project involves a brownfield cogeneration facility with integrated post-combustion carbon capture, aiming to create the world’s first net zero emissions integrated ethylene cracker and derivatives site for scope 1 and 2 emissions. |
Original sector | Energy |
Location
Country | Canada |
State | Alberta |
City | Fort Saskatchewan |
Source
Source | The Globe and Mail |
URL |
More Details
Record type | Project |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
