logo

DP Jain Nagda Gogapur BOT Annuity Road Project Private Limited

Sector: Automotive • Location: Madhya Pradesh, India

Source: World Bank Group

Project
Active

In October 2013, Madhya Pradesh Road Development Corporation (MPRDC) signed a 15-year concession with D P Jain & Co Infrastructure Limited (DPJ) for the strengthening, improvement,two-laning, operation and maintenance,and tolling of 14.98kms of existing major district road- Nagda-Gogapur (from KM0.000 from the end of CC road of Nagda village to KM14.980 at Gogapur village connecting to Mahidapur-T

Status
Prospective
Sector
Automotive, Bridge, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Madhya Pradesh, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about DP Jain Nagda Gogapur BOT Annuity Road Project Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “DP Jain Nagda Gogapur BOT Annuity Road Project Private Limited” is an infrastructure initiative in the Automotive sector, located in Madhya Pradesh, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 2013, Madhya Pradesh Road Development Corporation (MPRDC) signed a 15-year concession with D P Jain & Co Infrastructure Limited (DPJ) for the strengthening, improvement,two-laning, operation and maintenance,and tolling of 14.98kms of existing major district road- Nagda-Gogapur (from KM0.000 from the end of CC road of Nagda village to KM14.980 at Gogapur village connecting to Mahidapur-Tal MDR in Ujjain district,in the state of Madhya Pradesh. Under the contract, DPJ was responsible for the design, construction,finance, operation and maintenance,strengthening and widening the existing 2-lane carriageway to 2-lane divided carriageway.The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges,culverts, road intersections,interchanges, drains, etc.The expansion project, part of the MDR (major district roads) development project, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. D P Jain & Co Infrastructure Limited (DPJ) established DP Jain Nagda Gogapur BOT Annuity Road Project Private Limited,a special purpose vehicle in October 2013, to implement the project. The SPV won the tender through international competitive bidding, conducted by MPRDC,by requesting the lowest annuity payment of US$ 1.0mn (INR 59.9mn). Other details of bidding were not known at the time of collection of this information. Under the contract, the SPV was to recover the capital costs and operating costs including returns through semi-annual payments of US$ 0.51mn (INR 29.95mn) from MPRDC, during the term of concession. This was a free-use road, so no tolling would be applicable. DPJ would execute the EPC for the project. The concession agreement for the project was expected to be signed in October 2013. The project attained financial closure in April 2014. The project was expected to be financed with a debt/equity ratio of 75/25. The estimated capital cost of the project at the time of financial closure was US$ 5.3mn (INR 321.3mn @58.6 INR/USD). Financing comprised of a 12-year term loan of US$ 3.9mn (INR 240mn) and sponsor equity of US$ 1.3mn (INR 81.3mn). Other details of financing were not known at the time of collection of this information. The project was slated for completion by April 2016.

Original sector

Transport

Procurement method

Budget

Location

Country

India

State

Madhya Pradesh

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project