logo
ProjectClosed

Dragon River Bridge, Da Nang

One of 10,000+ projects Taiyo tracks in Vietnam.

Source: Road Traffic Technology

The Dragon River Bridge is 666m long and has six lanes for traffic. The Dragon River Bridge is 37.5m wide. The Dragon River Bridge links the city's east and west banks. The Dragon River Bridge crosses the Han River in the port city of Da Nang, Vietnam. The Dragon River Bridge was part of wider plans to develop urban transport systems on the banks of the Han River. The Dragon River Bridge is constr

Status
Closed
Sector
Airport, Bridge, Car parking, Commercial, Seaport, Road, Government, Automotive, Hotel
Location
Vietnam
Updated
22 Jul 2026
Source
Road Traffic Technology

ConstructChat

Ask ConstructChat about Dragon River Bridge, Da Nang

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Dragon River Bridge, Da Nang” is an infrastructure initiative in the Airport sector, located in Vietnam. Taiyo aggregates data on it from Road Traffic Technology.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Dragon River Bridge is 666m long and has six lanes for traffic. The Dragon River Bridge is 37.5m wide. The Dragon River Bridge links the city's east and west banks. The Dragon River Bridge crosses the Han River in the port city of Da Nang, Vietnam. The Dragon River Bridge was part of wider plans to develop urban transport systems on the banks of the Han River. The Dragon River Bridge is constructed over the Han River in the port city of Da Nang, Vietnam. The Han River splits the city in two, with the airport on the western side and beaches to the east. The bridge is the sixth to span the river, and takes its name because its design resembles a dragon, a creature with cultural significance in the country. Construction of the Dragon River Bridge began with a groundbreaking ceremony on 19 July 2009 – the same day that the nearby Thuan Phuoc Bridge was inaugurated. Vietnamese Prime Minister Nguyen Tan Dung attended both events. The bridge was opened on 29 March 2013 and cost about 1.5bn VND ($88m) to build. Purpose The construction of the Dragon River Bridge was approved in 2008 as part of wider plans to develop the urban transport system in Da Nang, particularly along the banks of the Han River. It also relieves congestion on the Han River Bridge in Da Nang’s cultural centre – the route most tourists use to reach the city’s beaches. The bridge connects the Nguyen Van Linh Highway on the west bank (starting at the Cham Museum) with the seaside highway, Son Tra-Dien Ngoc, on the east bank. This allows tourists to travel between the Da Nang International Airport and the beaches quickly. The bridge also eases travel to Da Nang’s Vietnam Television Centre, and boosts the economy. Designing the Dragon River Bridge The Dragon River Bridge is about 666m long, 37.5m wide and has six lanes for traffic. Each lane is 3.75m wide, and there is a 6m separator strip between traffic travelling in opposite directions. The bridge also has two 2.5m-wide sidewalks. The bridge includes a standing vibration level of six and navigational clearance of about 7m. It has a major span of 200m and two sidespans of 128m. The head span of the dragon’s head measures 72m and tail span 64m. The bridge is illuminated by LED lights at night. Contractors The Da Nang People’s Committee selected the Louis Berger Group and Ammann & Whitney to design the bridge, roadways, and the public plazas and squares on each side. Construction was carried out by Bridge Company No. 75 and Company No. 508 (an affiliate of Civil Construction Engineering Corporation No.5). It was supervised by the HaFICo Group and XFZ – GACS-China.

Original sector

Transportation

Location

Country

Vietnam

Source

Source reliability

High

Source

Road Traffic Technology

URL

More Details

Record type

Project

Sector

Airport, Bridge, Car parking, Commercial, Seaport, Road, Government, Automotive, Hotel

Article published date

2023-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project