Drainage Enhancements
Sector: Bridge • Location: New York, United States of America
Source: New York State Department of Transportation (NYSDOT)
This project proposes to reduce the incidents and magnitude of coastal storm related flooding at:
- Meadowbrook State Parkway under Merrick Road in the Town of Hempstead, Nassau County. The work includes hydraulically separating the Meadowbrook Parkway low point located under the Merrick Road bridge (approximately 1000 feet roadway length) with an earth embankment, check valves, rerouting of drai
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project proposes to reduce the incidents and magnitude of coastal storm related flooding at: 1. Meadowbrook State Parkway under Merrick Road in the Town of Hempstead, Nassau County. The work includes hydraulically separating the Meadowbrook Parkway low point located under the Merrick Road bridge (approximately 1000 feet roadway length) with an earth embankment, check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder. 2. Wantagh State Parkway under Bay Parkway in the Town of Hempstead, Nassau County. The work involves hydraulically separating the Wantagh Parkway low point located under the Bay Parkway bridge (approximately 1000 feet roadway length) with check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder and installing a coastline structure to protect outfall pipes that are repeatedly damaged from coastal storms. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
