Drainage Enhancements
Sector: Bridge • Location: New York, United States of America
Source: New York State Department of Transportation (NYSDOT)
This project proposes to reduce the incidents and magnitude of coastal storm related flooding at:
- Meadowbrook State Parkway under Merrick Road in the Town of Hempstead, Nassau County. The work includes hydraulically separating the Meadowbrook Parkway low point located under the Merrick Road bridge (approximately 1000 feet roadway length) with an earth embankment, check valves, rerouting of drai
- Status
- Under Construction
- Sector
- Bridge, Automotive, Road, Government
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- New York State Department of Transportation (NYSDOT)
ConstructChat
Ask ConstructChat about Drainage Enhancements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project proposes to reduce the incidents and magnitude of coastal storm related flooding at: 1. Meadowbrook State Parkway under Merrick Road in the Town of Hempstead, Nassau County. The work includes hydraulically separating the Meadowbrook Parkway low point located under the Merrick Road bridge (approximately 1000 feet roadway length) with an earth embankment, check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder. 2. Wantagh State Parkway under Bay Parkway in the Town of Hempstead, Nassau County. The work involves hydraulically separating the Wantagh Parkway low point located under the Bay Parkway bridge (approximately 1000 feet roadway length) with check valves, rerouting of drainage lines, and installing a Pump Station to drain the isolated area low point. Additional work includes installing underground drains to dewater the permanently soggy grass shoulder and installing a coastline structure to protect outfall pipes that are repeatedly damaged from coastal storms. |
Budget |
Location
Country | United States of America (USA) |
State | New York |
Source
Source | New York State Department of Transportation (NYSDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Automotive, Road, Government |
Article published date | 2026-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
