Drainage Improvement - Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Replacement of ditch bottom inlets with new Swale Inlet Type D-1 structures, the installation of type P-7T and J-7T manholes, the installation of twochamber control structures, and new Swale Inlet Type D-1 structures. Additionally, new 18 & 24 solid pipes, and 24 exfiltration trenches will be installed to connect the inlets to the proposed system and discharge into the SW 70th Ave Canal by running
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Raw Materials, Waste Processing and Treatment
- Location
- Pinecrest, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Drainage Improvement - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of ditch bottom inlets with new Swale Inlet Type D-1 structures, the installation of type P-7T and J-7T manholes, the installation of twochamber control structures, and new Swale Inlet Type D-1 structures. Additionally, new 18 & 24 solid pipes, and 24 exfiltration trenches will be installed to connect the inlets to the proposed system and discharge into the SW 70th Ave Canal by running through the existing RCP outfalls. This project will also include end-wall replacements and the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Pinecrest |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Raw Materials, Waste Processing and Treatment |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
