Drake University Mixed-Use Development Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Proposed renovation of an existing structure at the corner of 25th and University Ave into a music venue with an attached patio. A new mixed-use building with 4 stories and retail will be constructed south of the music venue 2413 and 2409 University ave.
- Status
- Prospective
- Sector
- Education, Stadium, Residential, Commercial
- Location
- Des Moines, Iowa, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Drake University Mixed-Use Development Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Proposed renovation of an existing structure at the corner of 25th and University Ave into a music venue with an attached patio. A new mixed-use building with 4 stories and retail will be constructed south of the music venue 2413 and 2409 University ave. |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Education, Stadium, Residential, Commercial |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
