Drax Group BECCS Retrofit Project
The owner, status and timeline of this project. A free account opens every field.
Source: macholevante.com
Drax Group in the UK is retrofitting its biomass power stations with carbon capture technology to implement Bioenergy with Carbon Capture and Storage (BECCS). The project aims to capture and store up to 8 million tonnes of CO2 annually by the late 2020s, contingent on supportive policy frameworks and infrastructure development.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Biomass, Residential, Commercial
- Location
- North Yorkshire, United Kingdom
- Updated
- 22 Jul 2026
- Source
- macholevante.com
ConstructChat
Ask ConstructChat about Drax Group BECCS Retrofit Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned and pilot phase |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Drax Group in the UK is retrofitting its biomass power stations with carbon capture technology to implement Bioenergy with Carbon Capture and Storage (BECCS). The project aims to capture and store up to 8 million tonnes of CO2 annually by the late 2020s, contingent on supportive policy frameworks and infrastructure development. |
Original sector | Energy and Environment |
Location
Country | United Kingdom (UK) |
City | North Yorkshire |
Source
Source | macholevante.com |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Biomass, Residential, Commercial |
Article published date | 2025-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
