Drax Repower Project
Sector: Power Generation (CCGT) • Location: Selby, Yorkshire and the Humber, United Kingdom
Source: Drax Global
The Drax Repower Project aims to upgrade up to two coal-fired electricity generating units to gas and add battery storage capacity. It includes plans for up to 3.6 GW of new gas generation capacity and 200 MW of battery storage, aligning with the UK government's strategy to phase out coal by 2025.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage
- Location
- Selby, Yorkshire and the Humber, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Drax Global
ConstructChat
Ask ConstructChat about Drax Repower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Drax Repower Project aims to upgrade up to two coal-fired electricity generating units to gas and add battery storage capacity. It includes plans for up to 3.6 GW of new gas generation capacity and 200 MW of battery storage, aligning with the UK government's strategy to phase out coal by 2025. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
State | Yorkshire and the Humber |
City | Selby |
Source
Source | Drax Global |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
