DRC COVID-19 Strategic Preparedness and Response Project (SPRP)
Sector: Airport • Location: Congo, Democratic Republic of
Source: World Bank
The proposed project will support the implementation of The Democratic Republic of Congo COVID-19 Preparedness and Response Plan endorsed by the Minister of Health (on March 16, 2020). It aims to: (i) strengthen technical and operational coordination of activities to prepare for and respond to COVID-19 through existing mechanisms and partnerships; (ii) develop and implement early detection of susp
- Status
- Closed
- Sector
- Airport, Waste Processing and Treatment, Seaport, Government, Hospital
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about DRC COVID-19 Strategic Preparedness and Response Project (SPRP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will support the implementation of The Democratic Republic of Congo COVID-19 Preparedness and Response Plan endorsed by the Minister of Health (on March 16, 2020). It aims to: (i) strengthen technical and operational coordination of activities to prepare for and respond to COVID-19 through existing mechanisms and partnerships; (ii) develop and implement early detection of suspected cases of COVID-19 with or without epidemiological links (including monitoring of travelers with or without epidemiological links) at entry points (airports, ports and other border posts), health facilities and the community; (iii) respond quickly and effectively to any suspected or confirmed case of COVID-19 thorough epidemiological investigation, evacuation, isolation and biological diagnosis, optimized psychosocial and medical care, preventive measures and infection control and tracking of pre-listed contacts; and (iv) develop and implement an aggressive communication campaign, awareness programs, and social distancing measures for behavioral change in the community, including communication at entry points and to airline companies. |
Original sector | FY17 - Health |
Budget |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Airport, Waste Processing and Treatment, Seaport, Government, Hospital |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in Congo, Democratic Republic of
- Terra AMC
- DRC - Goma Airport Safety Improvement Project
- Strengthening Hydro-Meteorological and Climate Services
- DRC COVID-19 Strategic Preparedness and Response Project (SPRP)
- DRC Multi-modal Transport
- Additional Financing DRC COVID-19 Strategic Preparedness and Response Project
- Strengthening Hydro-Meteorological and Climate Services
- DRC - Goma Airport Safety Improvement Project
