DRC Inga 3 and Mid-Size Hydropower Development TA
Sector: Power Generation (CCGT) • Location: Congo, Democratic Republic of
Source: World Bank Group
The objective of the Inga 3 Basse Chute and Mid-Size Hydropower Development Technical Assistance Project for Democratic Republic of Congo (DRC) is to contribute to the sustainable development of Inga 3 Basse Chute (BC) and selected mid-size hydropower projects. There are two components to the project, the first component being Inga 3 BC development support. This component will build on the feasibi
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Hydro
- Location
- Democratic Republic of the Congo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about DRC Inga 3 and Mid-Size Hydropower Development TA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the Inga 3 Basse Chute and Mid-Size Hydropower Development Technical Assistance Project for Democratic Republic of Congo (DRC) is to contribute to the sustainable development of Inga 3 Basse Chute (BC) and selected mid-size hydropower projects. There are two components to the project, the first component being Inga 3 BC development support. This component will build on the feasibility study for the development of the Inga site and associated interconnections financed in 2010-13 by the African Development Bank (AfDB). It will finance complementary studies, transaction advice and procurement support, and institutional support and sector strengthening. The scope of activities that will be financed by the TA will be influenced by the fine tuning of the allocation of activities and responsibilities between the public and private sector regarding the design and construction management of the common infrastructures. Finally, the second component is the mid-size hydropower development support. The component aims to develop midsize hydropower projects (with capacity between 10- 100 MW) by selecting potential projects, performing prefeasibility studies, accompanying bidding processes, and evaluating the possibilities for carbon finance. The component will result in feasibility studies and bidding documents, and support to Government of DRC, or GoDRC to select private developers and award concessions for three mid-size hydropower projects. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Democratic Republic of the Congo (DRC) |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
