logo

DRC Inga 3 and Mid-Size Hydropower Development TA

Sector: Power Generation (CCGT) • Location: Congo, Democratic Republic of

Source: World Bank Group

Project
Closed

The objective of the Inga 3 Basse Chute and Mid-Size Hydropower Development Technical Assistance Project for Democratic Republic of Congo (DRC) is to contribute to the sustainable development of Inga 3 Basse Chute (BC) and selected mid-size hydropower projects. There are two components to the project, the first component being Inga 3 BC development support. This component will build on the feasibi

Status
Closed
Sector
Power Generation (CCGT), Government, Hydro
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about DRC Inga 3 and Mid-Size Hydropower Development TA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “DRC Inga 3 and Mid-Size Hydropower Development TA” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Inga 3 Basse Chute and Mid-Size Hydropower Development Technical Assistance Project for Democratic Republic of Congo (DRC) is to contribute to the sustainable development of Inga 3 Basse Chute (BC) and selected mid-size hydropower projects. There are two components to the project, the first component being Inga 3 BC development support. This component will build on the feasibility study for the development of the Inga site and associated interconnections financed in 2010-13 by the African Development Bank (AfDB). It will finance complementary studies, transaction advice and procurement support, and institutional support and sector strengthening. The scope of activities that will be financed by the TA will be influenced by the fine tuning of the allocation of activities and responsibilities between the public and private sector regarding the design and construction management of the common infrastructures. Finally, the second component is the mid-size hydropower development support. The component aims to develop midsize hydropower projects (with capacity between 10- 100 MW) by selecting potential projects, performing prefeasibility studies, accompanying bidding processes, and evaluating the possibilities for carbon finance. The component will result in feasibility studies and bidding documents, and support to Government of DRC, or GoDRC to select private developers and award concessions for three mid-size hydropower projects.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project