logo
ProjectActive

DRC Transport and Connectivity Development Project

Active · Congo, Democratic Republic of

Source: World Bank

Activities of PACT2 will enhance sectoral institutions and capacity for improved resilient infrastructure and connectivity. These activities are expected to result in 200 km of an upgraded road corridor (integrating ducts for fiber-optic and electricity transmission cables), the construction of 2 critical bridges spanning 200 meters and 700 meters respectively; a legal framework for the creation o

Status
Prospective
Sector
Road, Rail, Power Generation (CCGT), Broadband, Seaport, Telecommunications, Raw Materials, Government
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about DRC Transport and Connectivity Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “DRC Transport and Connectivity Development Project” is an infrastructure initiative in the Road sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Activities of PACT2 will enhance sectoral institutions and capacity for improved resilient infrastructure and connectivity. These activities are expected to result in 200 km of an upgraded road corridor (integrating ducts for fiber-optic and electricity transmission cables), the construction of 2 critical bridges spanning 200 meters and 700 meters respectively; a legal framework for the creation of streamlined strategic sector institutions; a medium-term integrated climate-resilient Multimodal Transport Priority Investmement Program; strengthened capacity of local road construction industry/SMEs including access to credit lines/finance; trained engineers and transport specialists; a national road safety database; a post-crash response system and climate-resilient and gender-responsive socioeconomic infrastructure. These outputs are anticipated to lead to the intermediate outcomes that include improved climate-resilient road connectivity, strengthened digital connectivity and electricity transmission, enhanced transport governance and planning, improved road safety and year-round access to socioeconomic infrastructure. The longer-term outcome would be improved, safe, and climate-resilient transport connectivity in DRC.

Original sector

Industry, Trade and Services,Transportation

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Rail, Power Generation (CCGT), Broadband, Seaport, Telecommunications, Raw Materials, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project