Dreambuild Farm Building Expansion
Sector: Cement • Location: Los Fresnos, Texas, United States of America
Source: Dodge
Scope of Work: Steel Canopy over 7,000 sq ft of concrete slab. 1,152 sq ft of office space. Square Footage: 8,000 ft 2
- Status
- Prospective
- Sector
- Cement, Steel, Commercial, Raw Materials, Manufacturing (Industrial), Residential, Metal
- Location
- Los Fresnos, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dreambuild Farm Building Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work: Steel Canopy over 7,000 sq ft of concrete slab. 1,152 sq ft of office space. Square Footage: 8,000 ft 2 |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Los Fresnos |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Steel, Commercial, Raw Materials, Manufacturing (Industrial), Residential, Metal |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
