Dredging SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Phippsburg, Maine, United States of America
Source: Dodge USA
This project has a hopper dredge only requirement and consists of removing a total of about 75,000 CY of sand from two areas of the authorized, 27-foot deep, 500-feet wide Federal navigation channel in the lower Kennebec River. Dredging in the vicinity of Doubling Point may be to a maximum elevation of -35 Mean Lower Low Water (MLLW) and remove approximately 50,000 cubic yards of sand. The materia
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project has a hopper dredge only requirement and consists of removing a total of about 75,000 CY of sand from two areas of the authorized, 27-foot deep, 500-feet wide Federal navigation channel in the lower Kennebec River. Dredging in the vicinity of Doubling Point may be to a maximum elevation of -35 Mean Lower Low Water (MLLW) and remove approximately 50,000 cubic yards of sand. The material dredged from the Doubling Point area will be placed at the previously used in-river disposal ar... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
