Drenas Industrial Zone Infrastructure Project
Sector: Road • Location: Kosovo
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign loan of up to EUR 10 million to the Republic of Kosovo to finance an extension of an existing industrial zone located in the municipality of Drenas. The proposed project encompasses investments in main municipal infrastructure, including the construction of roads in the zone and their connection to the main road, the construction of a water supply network within the zone,
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Government, Power Generation (CCGT), Residential, Manufacturing (Industrial), Waste Processing and Treatment, Commercial
- Location
- Kosovo
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Drenas Industrial Zone Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign loan of up to EUR 10 million to the Republic of Kosovo to finance an extension of an existing industrial zone located in the municipality of Drenas. The proposed project encompasses investments in main municipal infrastructure, including the construction of roads in the zone and their connection to the main road, the construction of a water supply network within the zone, the construction of electrical grids within the zone and their connection with the main existing electrical grid of the zone, the construction of a gas network, the construction of a sewage system for the treatment of waste and industrial waters and the construction of a wastewater treatment plant (the Project). Enable industrial and manufacturing companies to expand their operations and become more competitive. The industrial zone will address some of the main constraints faced by companies to increase or make new investments in Kosovo: land ownership, expensive land purchase price and lack of infrastructure such as electricity, water and access to transport corridors. Moderate Good The transition impact of the proposed project will be achieved through: KOSOVO SOVEREIGN EUR 10,000,000.00 EUR 11,800,000.00 The Project is categorised B in accordance with the Environmental and Social Policy 2014. Environmental and social issues associated with financing the expansion of the existing industrial zone are associated with site specific environmental and social impacts which can be readily identified and addressed by appropriate mitigation measures. The client will be required to complete the Bank's Environmental and Social Questionnaire for Property Development in the first instance so that the Environmental and Social Department can determine the scope of further due diligence. The Environmental and Social Due Diligence for the proposed expansion will examine: environmental and social baseline conditions; potential past contamination; hydrogeological conditions; official environmental permits; information disclosure and public consultation; land acquisition process (already completed by the Ministry of the Finance); infrastructure provisions related to the road links, national grid links and the existing WWTP (and its expansion or replacement), construction-related environmental and social issues, such as labour and Occupation Health and Safety issues and building life & fire safety issues. The ESDD will also examine environmental and social management issues during the operational phase. An Environmental and Social Action Plan will be developed based on the findings of the ESDD. Nol Buzhala nol.buzhala@rks-gov.net +3833820036556 |
Original sector | Municipal Infrastructure |
Location
Country | Kosovo |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government, Power Generation (CCGT), Residential, Manufacturing (Industrial), Waste Processing and Treatment, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
