DRIED INDIAN CREEK TRAIL FROM I-20 TO E SOULE STREET
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The City of Oxford proposed project is from E. Soule Street (also named Williams Road) running south along the creek to Interstate 20 and terminating at E. Wade Street. Potential alternative routes are proposed as well. There appears to be no existing road, curb, or gutter. There appears to be a sanitary sewer line and a natural gas line within the project alignment. The project alignment will cro
- Status
- Under Construction
- Sector
- Natural Gas, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government
- Location
- Covington, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about DRIED INDIAN CREEK TRAIL FROM I-20 TO E SOULE STREET
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Oxford proposed project is from E. Soule Street (also named Williams Road) running south along the creek to Interstate 20 and terminating at E. Wade Street. Potential alternative routes are proposed as well. There appears to be no existing road, curb, or gutter. There appears to be a sanitary sewer line and a natural gas line within the project alignment. The project alignment will cross the Dried Indian Creek at two different points. This project would include a 12-foot-wide shared use path, two bridges, signage, and other safety measures. Please see the attached pdf for more details. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Covington |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government |
Article published date | 2024-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Natural Gas projects in United States of America
- Juvenile Justice Center Domestic Water System Rehabilitation, PW 21-36
- PG&E Gas Pipeline Replacement Project - Shell Cove
- FY 2011 Environmental Studies Program
- Catalysis
- Advanced Technology Solutions for Unconventional Oil and Gas Development
- Emerging Technologies for Methane Production via Biological In-Situ Coal Conversion and Low Cost Oxygen Production for Gasification
- Assessment of Genetic Diversity of Physaria (Lesquerella) congesta, Dudley Bluffs bladderpod and Physaria obcordata, Dudley Bluffs twinpod
- Fundamental Developments in Sensors and Controls for Power and Fuel Systems
