Drill - So Pre-Emption St Wd & Water Improve
Sector: Water Supply and Storage • Location: Waterloo, New York, United States of America
Source: Dodge USA
The work includes Directional Drilling on the east side of South Pre Emption Street. Five (5) Directional Drills are required for an approximate total length of 360 feet. The Contractor will also extend one (1) pipe length on one (1) side of the Directional Drill with the appropriate adapters. Water main materials will be provided by the Owner.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- Waterloo, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Drill - So Pre-Emption St Wd & Water Improve
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes Directional Drilling on the east side of South Pre Emption Street. Five (5) Directional Drills are required for an approximate total length of 360 feet. The Contractor will also extend one (1) pipe length on one (1) side of the Directional Drill with the appropriate adapters. Water main materials will be provided by the Owner. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Waterloo |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
