Drinking water supply and sanitation for Syrian refugees and host communities VII
Sector: Water Supply and Storage • Location: Jordan
Source: KFW Bank aus Verantwortung
The ongoing civil war in Syria has led to an increasing influx of refugees to Jordan, around 80 percent of whom live in towns and villages outside of the official refugee camps. This has further exacerbated the already critical situation of water supply and sanitation in the region. The aim of the project is to improve the drinking water supply and sanitation for the local population and refugees
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The ongoing civil war in Syria has led to an increasing influx of refugees to Jordan, around 80 percent of whom live in towns and villages outside of the official refugee camps. This has further exacerbated the already critical situation of water supply and sanitation in the region. The aim of the project is to improve the drinking water supply and sanitation for the local population and refugees in northern Jordan through broad-based expansion and to prevent conflicts over the scarce resource of water. The current Phase VII is being implemented together with the follow-up phase Drinking Water Supply and Sanitation for Syrian Refugees and Host Communities VIII (BMZ No. 2018 67 951). The basic package of measures includes the expansion and rehabilitation of drinking water and sanitation networks as well as the rehabilitation of water transport lines and pumping stations. The rehabilitation or replacement of wells is also planned in some cases. The specific selection of measures is to be based on a defined catalogue of criteria. We estimate the total costs at approximately EUR 66.0 million, which will be provided as a grant from Phase VII and Phase VIII. No contribution from the Jordanian side is planned. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
