Drinking water supply and wastewater disposal program Sucre IV
One of 2,358 projects Taiyo tracks in Bolivia.
Source: KFW Bank aus Verantwortung
The Sucre IV project is part of an integrated overall project with five components that is intended to ensure the water supply for Sucre. Sucre IV covers components II and IV. Component II (Sucre IV) Increase in treatment capacities (new drinking water treatment plant, extensions or adjustments to the main pipe system), financed by the Sucre IV measure presented here (2016 69 126, 2016 65 363). Co
- Status
- Prospective
- Sector
- Commercial, Tunnel, Water Supply and Storage, Government, Waste Processing and Treatment
- Location
- Bolivia
- Updated
- 19 Nov 2026
- Source
- KFW Bank aus Verantwortung
ConstructChat
Ask ConstructChat about Drinking water supply and wastewater disposal program Sucre IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Sucre IV project is part of an integrated overall project with five components that is intended to ensure the water supply for Sucre. Sucre IV covers components II and IV. Component II (Sucre IV) Increase in treatment capacities (new drinking water treatment plant, extensions or adjustments to the main pipe system), financed by the Sucre IV measure presented here (2016 69 126, 2016 65 363). Component IV (accompanying measure Sucre IV) - Institutional support (strengthening the water supplier in the administrative and commercial areas), financed by the accompanying measure Sucre IV (BMZ No. 2017 70 171). The other components I, III and V are covered by the FC measures Sucre III and Ravelo as well as the executing agency's own funds, possibly financed by other donors. Component I (Sucre III) Increasing the raw water supply (pumping station, water supply including tunnel), financed by FC measure Sucre III (BMZ No. 2009 65 608) Component III (Ravelo) Integrated water catchment management (sustainable use of resources in the Ravelo river catchment area), financed by the FC measure Integrated Water Catchment Management Ravelo (BMZ No. 2013 66 350)). Component V - Wastewater Implementation of immediate measures to optimise wastewater disposal and absorb increased wastewater volumes. Financing from the partner's own resources. |
Budget |
Location
Country | Bolivia |
Source
Source | KFW Bank aus Verantwortung |
URL |
More Details
Record type | Project |
Sector | Commercial, Tunnel, Water Supply and Storage, Government, Waste Processing and Treatment |
Article published date | 2024-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
