logo
ProjectBidding

Drinking Water System

One of 10,000+ projects Taiyo tracks in Missouri.

Source: Dodge

Water Line, Water Supply, Water Treatment Plant. Bids to Owner Public - Local December 08 at 01:00 PM (CST)

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Solar, Tunnel, Rail, Road, Manufacturing (Industrial), Metal, Telecommunications, Broadband, Waste Processing and Treatment, Power Transmission
Location
Mokane, Missouri, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Drinking Water System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Drinking Water System” is an infrastructure initiative in the Water Supply and Storage sector, located in Mokane, Missouri, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Water Line, Water Supply, Water Treatment Plant. Bids to Owner Public - Local December 08 at 01:00 PM (CST)

Original sector

Water, Sanitation And Waste Management

Budget

Location

Country

United States of America (USA)

State

Missouri

City

Mokane

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Solar, Tunnel, Rail, Road, Manufacturing (Industrial), Metal, Telecommunications, Broadband, Waste Processing and Treatment, Power Transmission

Article published date

2026-11-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project