Drinkwater Elementary Water Service Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Drinkwater Elementary Water Service Replacement. A general description of the scope of work is as follows (and as noted on Drawings): a. Location of existing utilities within the project area b. Installation of erosion & sediment control works (best practice measures) including removal once project is complete. c. Installation of tree protection fencing including removal once complete. d. Installa
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Road, Commercial, Power Generation (CCGT)
- Location
- Duncan, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Drinkwater Elementary Water Service Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Drinkwater Elementary Water Service Replacement. A general description of the scope of work is as follows (and as noted on Drawings): a. Location of existing utilities within the project area b. Installation of erosion & sediment control works (best practice measures) including removal once project is complete. c. Installation of tree protection fencing including removal once complete. d. Installation of all works shown on the drawings and contract documents. e. Pressure testing, chlorination... |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Duncan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Road, Commercial, Power Generation (CCGT) |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
