Drombeg Phase 2 Solar Project
One of 10,000+ projects Taiyo tracks in Ireland.
Source: SolarQuarter
Greencells has signed an EPC contract with ESB for the development of the Drombeg Phase 2 solar project, which has a capacity of 63.88 MWp. This project expands the total capacity of the Drombeg solar site to 136.88 MWp, making it one of the largest solar parks in Ireland. ESB is a major state-owned utility in Ireland, actively expanding its renewable energy portfolio as part of its decarbonizatio
- Status
- Closed
- Sector
- Solar, Power Transmission, Power Generation (CCGT), Government
- Location
- Ireland
- Updated
- 22 Jul 2026
- Source
- SolarQuarter
ConstructChat
Ask ConstructChat about Drombeg Phase 2 Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Greencells has signed an EPC contract with ESB for the development of the Drombeg Phase 2 solar project, which has a capacity of 63.88 MWp. This project expands the total capacity of the Drombeg solar site to 136.88 MWp, making it one of the largest solar parks in Ireland. ESB is a major state-owned utility in Ireland, actively expanding its renewable energy portfolio as part of its decarbonization strategy. |
Original sector | Energy |
Location
Country | Ireland |
Source
Source | SolarQuarter |
URL |
More Details
Record type | Project |
Sector | Solar, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-11-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
