DRP at Creech AFB Phase 1
Sector: Metal • Location: Indian Springs, Nevada, United States of America
Source: Dodge
Phase One: It is comprised of the construction of a 47.9KSF Squadron Operations facility as well as a 55.6KSF Aircraft Operations Facility. The AOF consists of multiple hangar bays. Both buildings made use of similar security systems. Work includes the design construction and installation of: reinforced concrete foundations, concrete floor slab, structural steel frame, concrete masonry units, gyps
- Status
- Prospective
- Sector
- Metal, Aerospace & Defense, Steel, Cement, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Indian Springs, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about DRP at Creech AFB Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase One: It is comprised of the construction of a 47.9KSF Squadron Operations facility as well as a 55.6KSF Aircraft Operations Facility. The AOF consists of multiple hangar bays. Both buildings made use of similar security systems. Work includes the design construction and installation of: reinforced concrete foundations, concrete floor slab, structural steel frame, concrete masonry units, gypsum wallboard, and a combination single ply membrane/standing seam metal low slope roof, utilities... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Indian Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Aerospace & Defense, Steel, Cement, Power Transmission, Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
