logo

Drumheller Flood Mitigation along Red Deer River Valley

Sector: Hydro • Location: Alberta, Canada

Source: Infrastructure Canada

Project
In Progress

The Drumheller Flood Mitigation and Climate Change Adaptation System combines long established structural features with policies and preparedness. The structural mitigation measures are rail embankments, provincial highways and bridges, provincial dyking, and existing municipal roads and trails with the natural systems of the badlands river valley topography, riparian areas, and flood plains to cr

Project Information FAQ

Project Information

4 Q
The project “Drumheller Flood Mitigation along Red Deer River Valley” is an infrastructure initiative in the Hydro sector, located in Alberta, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Drumheller Flood Mitigation and Climate Change Adaptation System combines long established structural features with policies and preparedness. The structural mitigation measures are rail embankments, provincial highways and bridges, provincial dyking, and existing municipal roads and trails with the natural systems of the badlands river valley topography, riparian areas, and flood plains to create a river confinement facility while providing room for the river at high flow. Operational measures, emergency preparedness, and policies are integral to create a Flood Mitigation System and strategy today - and well into the future to ensure adaptation to the changing climate and provide a truly resilient approach. Detailed flood control efforts conducted in the 1980s of structural and non-structural resiliency methods were incorporated, in part, to the community. Due to the Canada-Alberta funding stopping in the 1990s, some permanent structural measures were not completed. In terms of scope, new dykes will be constructed in selected critical areas to an elevation that protects against the 1640 cms river flow rate and existing dykes built by the province will be augmented to match this. The overall system is intended to provide a permanent solution that can adapt to climate change. The new dykes have been designed with resiliency in mind. In the future, they can be enhanced to withstand a higher flow of up to 2000 cms and the system will be integrated where practicable, with the Badlands River Park Trails System providing an opportunity to educate a flood resilient populace (also considering the 450,000 who visit Drumheller annually) through nodal kiosks stations. This system would be reinforced with river monitoring tools to support constant communications with the Town of Drumheller as well as the Dickson Dam to immediately execute any necessary emergency protocols and/or emergency dyke enhancements as events happen.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data