Drumheller Flood Mitigation along Red Deer River Valley
Sector: Hydro • Location: Alberta, Canada
Source: Infrastructure Canada
The Drumheller Flood Mitigation and Climate Change Adaptation System combines long established structural features with policies and preparedness. The structural mitigation measures are rail embankments, provincial highways and bridges, provincial dyking, and existing municipal roads and trails with the natural systems of the badlands river valley topography, riparian areas, and flood plains to cr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Drumheller Flood Mitigation and Climate Change Adaptation System combines long established structural features with policies and preparedness. The structural mitigation measures are rail embankments, provincial highways and bridges, provincial dyking, and existing municipal roads and trails with the natural systems of the badlands river valley topography, riparian areas, and flood plains to create a river confinement facility while providing room for the river at high flow. Operational measures, emergency preparedness, and policies are integral to create a Flood Mitigation System and strategy today - and well into the future to ensure adaptation to the changing climate and provide a truly resilient approach. Detailed flood control efforts conducted in the 1980s of structural and non-structural resiliency methods were incorporated, in part, to the community. Due to the Canada-Alberta funding stopping in the 1990s, some permanent structural measures were not completed. In terms of scope, new dykes will be constructed in selected critical areas to an elevation that protects against the 1640 cms river flow rate and existing dykes built by the province will be augmented to match this. The overall system is intended to provide a permanent solution that can adapt to climate change. The new dykes have been designed with resiliency in mind. In the future, they can be enhanced to withstand a higher flow of up to 2000 cms and the system will be integrated where practicable, with the Badlands River Park Trails System providing an opportunity to educate a flood resilient populace (also considering the 450,000 who visit Drumheller annually) through nodal kiosks stations. This system would be reinforced with river monitoring tools to support constant communications with the Town of Drumheller as well as the Dickson Dam to immediately execute any necessary emergency protocols and/or emergency dyke enhancements as events happen. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
