Drumlins Park Wind Farm Blade Break Investigation
Sector: Wind • Location: Ireland
Source: reNews.Biz
GE and Energia are investigating the cause of a blade break at the 48MW Drumlins Park wind farm in County Monaghan, Ireland. The incident occurred on April 22, 2026, involving turbine 8 in the array. The wind farm has been temporarily shut down while the incident is assessed. The wind farm began construction in spring 2022 and started commercial operation in 2024, featuring GE Vernova 6.1-158 turb
- Status
- Under Construction
- Sector
- Wind, Raw Materials, Commercial
- Location
- Ireland
- Updated
- 22 Jul 2026
- Source
- reNews.Biz
ConstructChat
Ask ConstructChat about Drumlins Park Wind Farm Blade Break Investigation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational with temporary shutdown due to incident |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GE and Energia are investigating the cause of a blade break at the 48MW Drumlins Park wind farm in County Monaghan, Ireland. The incident occurred on April 22, 2026, involving turbine 8 in the array. The wind farm has been temporarily shut down while the incident is assessed. The wind farm began construction in spring 2022 and started commercial operation in 2024, featuring GE Vernova 6.1-158 turbines. |
Original sector | Renewable Energy |
Location
Country | Ireland |
Source
Source | reNews.Biz |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Commercial |
Article published date | 2026-04-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
