Dry Dock 3 Modernization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Dry Dock 3 modernization project includes the following major components: rebuilding the caisson seats with deep foundations, refurbishing the dock floor and walls, pinning the concrete floor, constructing a wet well and pump house to replace the existing pumpwell, rerouting all utilities into a new utility trench around the dock perimeter, and replacing the dry dock s surrounding rail systems
- Status
- Closed
- Sector
- Government, Cement, Commercial, Rail, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT)
- Location
- Portsmouth, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Dry Dock 3 Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dry Dock 3 modernization project includes the following major components: rebuilding the caisson seats with deep foundations, refurbishing the dock floor and walls, pinning the concrete floor, constructing a wet well and pump house to replace the existing pumpwell, rerouting all utilities into a new utility trench around the dock perimeter, and replacing the dry dock s surrounding rail systems. 2. Dry Dock: The floors and walls of the dry dock will be reconstructed by initially removing a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Portsmouth |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Rail, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- SR 2 FM SR 15 IN CLAYTON TO SOUTH CAROLINA STATE LINE
