DSHS - OB2 - 1W & 2SW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope of Alterations work is as indicated on drawings and specifications. In general, the scope includes: Remodel of interior spaces of approximately 31,000 square feet. Remodel includes demolition of existing interior partitions and floor coverings, construction of interior partitions, doors, relites, casework and finishes including floor coverings. Modifications to existing plumbing, mechanical,
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- Olympia, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about DSHS - OB2 - 1W & 2SW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Alterations work is as indicated on drawings and specifications. In general, the scope includes: Remodel of interior spaces of approximately 31,000 square feet. Remodel includes demolition of existing interior partitions and floor coverings, construction of interior partitions, doors, relites, casework and finishes including floor coverings. Modifications to existing plumbing, mechanical, electrical, lighting, fire suppression, and fire alarm systems are included |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Olympia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
